1. The beneficiary submits a street paving request through the electronic portal, and the user's identity is verified using the "Yaqeen" service, with the required documents attached.
2. The Safety Department head reviews the request and attachments and forwards it to the surveyor for study.
3. The surveyor studies the request, prepares a report, and submits it to the Safety Department head.
4. The Safety Department head forwards the request to the municipality's Roads Department head.
5. The municipality's Roads Department head studies the request and forwards it to the inspector.
6. The inspector calculates the estimated cost and forwards the request to the contractor.
7. The contractor determines the actual cost and forwards the request to the municipality's Roads Department head.
8. The municipality's Roads Department head approves the execution of the request.
9. The beneficiary receives a text message confirming the execution of the request.